No Nama Peserta K SK SB B A T ST P PT HN H SH SA P PK Alasan
1 CV. GRACONA - 02.683.113.1-214.001 100,0 100,0 90,15 Rp. 145.200.000,00
Rp. 145.200.000,00
100,0 92,61
2 PT. KURNIA TEKNIK KONSULTAN - 03.212.946.2-214.000 100,0 100,0 86,46 Rp. 158.840.000,00
Rp. 158.840.000,00
91,41 87,7
3 WADAH CIPTA TEKNIK. PT - 02.483.443.4-214.000 100,0 100,0 86,81 Rp. 159.940.000,00
Rp. 159.940.000,00
90,78 87,8
4 PT. ABATA RENCANA KARYANUSA - 03.047.589.1-211.000 Penggandaan Materai
5 CV. ALPHA ROMEO ENGINEERING CONSULTANT - 81.615.937.0-214.000 60,0 60,0
6 CV. BUHARA PERSADA - 31.664.998.7-216.000 95,0 95,0
7 CV. SALHAFI SENTOSA - 75.066.081.3-216.000 60,0 60,0
8 PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 91,0 91,0
9 CV. Vistatama Multi Engineering Consultant - 02.483.525.8-214.000 100,0 100,0 tidak hadir pembuktian kualifikasi
10 Astadeca Teknik Konsultan - 83.093.416.2-003.000 75,82 75,82
11 CV. Prima Kreasi Arsindo Consultant - 02.067.928.8-215.000 100,0 100,0 tidak hadir pembuktian kualifikasi
12 CV. Acksono Reka Cipta Konsultan - 02.404.264.0-214.000 100,0 100,0
13 CV. GRAHADITAMA CONSULTAN - 01.852.705.1-214.000 92,0 92,0
14 CV.MIMARVISION ENGENEERING - 75.177.235.1-214.000
15 PT.BENTAN SONDONG - 01.843.358.1-214.000
16 CV. KENEN KONSULTAN - 02.157.637.6-214.000
17 CV. DUA PUTRA - 72.258.541.1-302.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • B Pembuktian Kualifikasi
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak